In the mountains of southern Serbia near the town of Trgovište, another of our foreign projects was completed: the Small Hydro Power Plant Pročovci 1. The construction work was finished in spring 2012 and the installation of the turbosets and the electrical distribution, measurement and control equipment started immediately, so the power plant was handed over in summer 2012.
The water facility consists of a water intake and a DN 1300 plastic feeder pipeline to the power plant building.
In the machine room there are two turbosets with spiral Francis turbines with outputs of 700 kW and 300 kW. Both turbosets are equipped with TES Vsetín synchronous generators.
The electrical equipment is complemented by a pair of WOODWARD MFR13 combined protection relays. In-house SY2 synchronisers, complemented by a CIRCUTOR SYNCHROMAX synchrocheck, ensure safe connection of the generators to the public power grid.
The control system of the power plant is a HONEYWELL HC900 hybrid controller, which has already proven itself at SHPP Bakov nad Jizerou and SHPP Ptýrov. The current state of the machinery is visualised on a programmable UNITRONICS V570 with a 5.7" colour touch screen, placed on the door of the measurement and control switchboard. HONEYWELL Experion HS R400 software displays and archives the operating data, so the operator can not only watch the current state of the machinery but also browse and analyse historical data with an extensive set of tools for graphs and tabular reports of operating events. Small Hydro Power Plant Pročovci 1 is accessible for remote operators via VPN over the internet. A Cinterion TC65i GSM modem automatically sends alarm and information SMS messages to the power plant operator, the facility manager and the HV distribution service staff.
The power plant is complemented with continuous monitoring via a digital camera system, which automatically records images whenever an unauthorised person enters the monitored zone.