ZEVO Mělník – ČEZ Group

ZEVO Melnik
Source: ZEVO Mělník, Skupina ČEZ

Investor / Client: ČEZ Group (Mělník Power Plant / Horní Počaply)

Plant parameters

Incineration capacity: 320,000 t/year of municipal solid waste (MSW) – 2× 160 kt/year

Thermal input: 110 MWt

Energy production: 1,400 TJ of heat and 160 GWh of electricity annually (supplying approximately 230,000 households)

Logistics: 80% provided by rail transport (dedicated rail siding and container transfer terminal)

Control system: Honeywell Experion® PKS | Honeywell Safety Manager (SIL3)

Schedule: Construction 2024–2028, trial operation from 2028

Project description and scope of work

Complete supply of application software and engineering services for a new energy-from-waste facility (ZEVO).

DCS Experion® PKS: Development of a comprehensive software architecture for 2 boiler incineration lines, flue gas cleaning, the steam turbine and auxiliary systems.

ESD Safety Manager (SIL3): Design and implementation of emergency shutdown safety logic in strict compliance with IEC 61511.

Process control: Tuning of complex control loops (combustion process, drum level, steam cycle) for stable and safe operation.

Commissioning: Cold and hot testing (SZ/TZ), FAT/SAT testing and specialist participation in performance guarantee testing.