Another Czech small hydropower plant has been reconstructed in the scenic foothills of the Orlické hory mountains. In the former Cakle mill on the Tichá Orlice River, within the municipality of Libchavy in the Pardubice Region, a repaired open-flume Francis turbine with an asynchronous generator was ready to restart. Jiří Janata – Vodní turbíny of Libštát handled the mechanical repairs; our company designed and installed the electrical equipment and control system.
The waterworks in the settlement of Cakle have a long history. The first records of the manorial mill date from 1560. At the end of the 19th century it was converted into a weaving mill; eventually only the hydropower plant remained, operating intermittently until the 1990s. The first reconstruction phase covered the Francis turbine and its 45 kVA asynchronous generator. Both the building and the site’s hydropower potential allow for the future installation of a second unit.
The control system was designed for maximum simplicity while retaining operator convenience and sufficient capacity for future expansion. The established UNITRONICS 530 PLC was therefore selected and supplemented by a CINTERION MC35i Terminal GSM modem. A CIRCUTOR CVM96 power analyser measures the electrical quantities.
The control system provides sequence control for automatic starting, stopping and emergency shutdown of the unit; water-level regulation with an adjustable deadband; communication with the operator and maintenance technician over the GSM network; software-based reverse-power and asymmetry protection; and storage of operating data.
It also provides regular automatic turbine flushing to maintain maximum efficiency when small debris such as grass and leaves passes through. Fire and intruder alarms are integrated, with alerts sent to three selected telephone numbers. The system counts the unit’s operating hours and monitors bearing lubrication intervals, including control of an automatic lubrication pump.