Investor / Client: ČEZ Group (Mělník Power Plant / Horní Počaply)
Plant parameters
Incineration capacity: 320,000 t/year of municipal solid waste (MSW) – 2× 160 kt/year
Thermal input: 110 MWt
Energy production: 1,400 TJ of heat and 160 GWh of electricity annually (supplying approximately 230,000 households)
Logistics: 80% provided by rail transport (dedicated rail siding and container transfer terminal)
Control system: Honeywell Experion® PKS | Honeywell Safety Manager (SIL3)
Schedule: Construction 2024–2028, trial operation from 2028
Project description and scope of work
Complete supply of application software and engineering services for a new energy-from-waste facility (ZEVO).
DCS Experion® PKS: Development of a comprehensive software architecture for 2 boiler incineration lines, flue gas cleaning, the steam turbine and auxiliary systems.
ESD Safety Manager (SIL3): Design and implementation of emergency shutdown safety logic in strict compliance with IEC 61511.
Process control: Tuning of complex control loops (combustion process, drum level, steam cycle) for stable and safe operation.
Commissioning: Cold and hot testing (SZ/TZ), FAT/SAT testing and specialist participation in performance guarantee testing.