SHPP Djordjine, Republic of Serbia

Pelton turbine before placing

Published ·

The investor in the Small Hydro Power Plant Djordjine was the company VLASINA ECO ENERGY d.o.o Beograd. Our company supplied all machinery and the control system as a 'turnkey' solution.

Water is fed to the power plant by pipeline with net head of 140.7 m. The flow through the power plant is 0.25 m3/s.

In the machine room there is a horizontal two-nozzle Pelton turbine with an overhung runner on the shaft of the generator with an output of 320 kW.

The control system of the power plant is a programmable UNITRONICS Vision 1040 with HMI interface, and it is placed on the door of the switchboard. It is accompanied by a Windows operator station, which is connected to the Vision 1040 via the SCADA system HONEYWELL Experion PKS HS. Small Hydro Power Plant Djordjine can also be monitored and controlled remotely.

The power plant is complemented with continuous monitoring via a camera system of four fixed cameras. These cameras are situated in and outside of the machine room.