Project

Hladilnik hydroelectric power station, Bulgaria

Hladilnik hydroelectric power station, Bulgaria

Published ·

Our biggest hydroelectric power plant project at the time was completed in spring 2012. The brand-new hydro scheme in the Rhodope Mountains was designed on a grand scale and promised good results from the start. This time our company was the general contractor for the entire turnkey technology.

Parameters of the hydroelectric scheme: a concrete dam with a maximum height of 26 m and a crest length of 97 m, and a reservoir with a water surface of 4.06 ha. Water is fed to the power plant through a bored tunnel 660 m long with a cross-section of 2.6 × 3 m. The turbosets work with a flow range of 0.5–5.5 m3/s and a total net head of 37 m.

The power plant building is equipped with three turbosets with spiral Francis turbines with an overhung runner on shafts for synchronous generators with outputs of 480 kW + 660 kW + 660 kW.

Construction of the machinery began in 2011 and the turbosets were assembled at the TES Vsetín production plant. In November 2011 the units were transported to the site, set in place and connected to the supply pipes and draft tubes. At the same time, work began on the electrical equipment: the prefabricated high-voltage, low-voltage and measurement and control switchboards were installed, and the control system was gradually completed and tested.

The control system of the power plant is HONEYWELL Experion PKS R300. Our staff have extensive experience with it from other fields (the energy and chemical industries), but this was the first time it was used for a hydroelectric power plant. The controller configuration has 128 digital inputs, 96 analogue inputs (including temperature measurement) and 128 digital outputs. It is accompanied by a server, a Windows operator station with one monitor and an HMI interface using a programmable UNITRONICS Vision 1040.

The power plant is complemented with continuous monitoring via a camera system consisting of one Axis 214PTZ rotating camera and Vivotek IP8331 fixed IP cameras.

Remote supervision of the machinery is provided over the internet using up to 32 parallel VPN channels via a DrayTek Vigor 2820 broadband firewall-router.

Let’s discuss your project.